Production Schedule
| Day | Location | Scenes | Props | Time Es. |
| Day 1 | School - Kent College. |
Voice over - will be recored at school. Graduation Scene - filmed outside front entrance of school, tripod and camera required.
|
Graduation gown and cap for graduation scene + iPhone (as prop to take photos in shot). |
8 hours - 9:00am - 4:00pm. |
| Day 2 | Chloe's house - Chestfield Road, School - Kent College, Simone's House - Littlebourne |
Crash Scene - crane and camera needed for high angle shots of crash scene, proposal scene - use of establishing shots, tripod and camera required , Pregnancy scene - tripod and camera required. Work Scene - tripod and camera required, extras needed to play different interviewees.filmed in english block in classroom foyer, tripod and camera required. | Fake blood, watch, dolly, fake belly needed (for pregnancy scene.) Laptop for work/interview scene. |
8 hours - 9:00am - 4:00pm. |
| Day 3 | Ickham Church, Gran’s house. | Marriage Scene - this will be filmed at the church, camera and tripod needed to capture establishing shots. What could have happened Scene - this will be filmed at Gran's house, tripod and camera required.. | Wedding dress - white (two piece dress), suit for Freddie needed (blue and white). | 8 hours - 9:00am - 4:00pm. |
Contingency Plan
There are a lot of aspect to the production of this short film. Therefore, there will be problems that we will come against. Due to this a contingency plan will be drawn up in order to prepare if any problems occur, so I can sort them out quickly without delaying production for too long. As we are filming at the school, if the location we have planned is not available, we can look to another classroom within the school, so this is a fairly simple contingency plan. If the timings do not work, we will all get together as a group to discuss the best times that everyone can do. If the day one timings don't work, I will add these filming activities to day 3.
No comments:
Post a Comment